Prime civil engineering for Portland’s Springwater Connector: safer bike and pedestrian links, mid-block crossings, and stormwater along a busy multimodal corridor.
Springwater Connector
Description
Prime civil engineering for Portland’s Springwater Connector: safer bike and pedestrian links, mid-block crossings, and stormwater along a busy multimodal corridor.
Challenge
Maintain continuous bike and pedestrian access through an active construction corridor while meeting PBOT and ADA standards.
Solution
Phased traffic control, AASHTO-compliant crossing geometry, and creative on-site stormwater that kept the greenway connected during construction.
Related projects

Portland, OR
Broadway Bridge Painting
As a subconsultant, Nationwide Engineering Plans provided temporary traffic control plans for deck repairs and painting on the Broadway Bridge over the Willamette River in Portlan…
View project
Portland, OR
I-205: Glenn Jackson Bridge to Johnson Creek, Phase 2
As a subconsultant, Nationwide Engineering Plans provided engineering and design services for 14 Active Traffic Management sign and structure sites along I-205 in the Portland, OR…
View project
Portland, OR
PBOT ADA Curb Ramp Replacement Program
Subconsultant civil support for Portland Bureau of Transportation’s citywide ADA curb ramp replacement and inventory program.